Research on the Effect of Coupling Structure of Prestressed Anchor Rods and Steel Wave-Profile Plates on the Support of High-Stress Soft Rock Tunnel

Gan Li1

Yong Li2,3, Email

1Institute of Rock Mechanics, Ningbo University, Ningbo, Zhejiang, 315000, China
2Department of Civil Engineering, Hangzhou City University, Hangzhou, Zhejiang, 310015, China
3Ocean College, Zhejiang University, Zhoushan, Zhejiang, 310058, China

 

Abstract

The problem of deep-buried tunnels with high ground stress and large deformation in soft rock has always been a major technical challenge that urgently needs to be solved in tunnel engineering. Taking the large-section deep-buried soft rock tunnel with large deformation as the research background, through the methods of on-site monitoring, numerical simulation and similar physical model experiments, and based on the displacement field, stress-strain field, DIC monitoring and acoustic emission, the deformation mechanism of the soft rock tunnel supported by grouting anchor rods +I22b steel arch frames was studied. A support method for deep-buried tunnels with high ground stress and large deformation of soft rock (synergistic coupling support of prestressed pressure anchorage cables + steel corrugated plates) was proposed, and it was further verified through numerical simulation experiments and similar physical model experiments. The results show that under the collaborative coupling support of prestressed pressure anchorage cables and steel corrugated plates, the deformation of the surrounding rock of the tunnel can be controlled below 320mm, demonstrating excellent deformation coordination ability and providing a new idea for the treatment of other deep-buried tunnels with high ground stress and large deformation in soft rock.

Research on the Effect of Coupling Structure of Prestressed Anchor Rods and Steel Wave-Profile Plates on the Support of High-Stress Soft Rock Tunnel